It’s finally warm enough to start setting up our biogas system. A few weeks ago we got one of our neighbors down to help us level a pad for the unit and we gathered together all the bits and pieces we needed to set up the first part of the unit (the digester and gas collector part), we will set up the cooker that came with the unit once it is producing gas. The toilet attachment will be installed as part three of this project as we have to wait until the unit is active before we add human manure to the mix.
The unit will be to the North of the humpy, close to the kitchen and right beside the toilet. That way the gas does not have to travel far and neither does the poop.


Next we laid down a ute mat made of rubber to protect the digester from any sharp stones that might be in the soil. The unit came with it’s own rubber mat, but we wanted to be sure it was protected. The extra rubber also insulates the unit from the cold soil a little.

Then it was time to put the pieces together and set up the unit itself. There is a really handy app that talks you through the whole process.



Filling the unit with water felt like a real achievement after all the brain work of putting the jig saw together. While it was filling up we got busy filling up the sand bags that become weights for the gas collector (the unit uses these weights to put the gas under low pressure so it is pushed through the gas line to the stove).

The following sequence of photos show fairly clearly how to fill and seal the bags so there is not much air in them. This is important as the pockets the bags go into are quite narrow and the bags have to be squeezed into them.








The unit will begin to bubble and produce methane over the next few weeks and we will add the gas line and the toilet as part of the next stage. Look out for the next installment in a fortnight…