Earthbag building experiment- the new bathroom- finishing the foundation

The foundations are VERY close to being finished. My partner called into Tabulam Sand and Gravel on the way home from work and loaded up another tonne of gravel (smaller pieces this time) by torch light and bought it home. I unloaded this lot into the trench, tamped it down and put the tires on top. I filled the tires one at a time with the gravel and leveled them up (they are leveled so that the walls can be built straight up, but I will have to build a few extra layers to level in the other direction).

The larger gravel in the trench.

Waiting for the next load of gravel.

A trailer full of smaller gravel.

A badly exposed photo of the trench…I just thought it looked pretty.

Starting to fill the tires with small gravel.

The tires are leveled in one direction, so the walls won’t tilt.

Of course we are three wheelbarrows short of finishing the foundation. That’s just the way it works.

The doggy building inspectors appear to approve.

We went to Bunnings and got a door and frame, some materials for making ‘velcro plates’ to attach doors and windows to (more on these next post) and some plastic to cover the walls until we can render them. Now all I need to do is find the last three wheelbarrows required for the foundation.

Next time….on to the walls.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s